Zum Inhalt springen
Bpanda-Hilfe
English
Esc
navigierenöffnen⌘Jvorschau
Auf dieser Seite

Capturing a Happy Path

As a Designer, you can capture the standard flow of a process as a Happy Path.

As a Designer, you can capture the standard flow of a process as a Happy Path. Bpanda automatically creates the corresponding process diagram.

Prerequisites

You are assigned as a Designer in the Process Space.

You have named and described a process draft.

Background

The so-called Happy Path is where the actual capturing of a flow begins. A Happy Path presents the standard flow quickly and easily in table form. At the same time, a process diagram is created that you can extend later in the Modeler.

The Happy Path editor offers the following working areas.

Top toolbar

The toolbar offers functions for the draft as a whole. If you position the mouse pointer over an icon, the function is displayed.

  • New draft
  • Open draft
  • Save draft
  • Delete draft
  • Export diagram
  • Translate into other languages
  • Print draft
  • Change participants

Prerequisite for participants: Participants can only be added once the process draft has been saved. Participants can only be added if they have permission to model. Only one participant at a time can work on a draft. Two or more participants cannot work on a draft at the same time.

Descriptions

The expandable Descriptions area contains the description of the process and formatting icons.

When collapsed, only the existing description is displayed.

In the Happy Path, you can assign tasks (activities) to different responsibilities (lanes).

Table for capturing tasks and assigning lanes

The table consists of three columns.

  • Task

    The entry under Task is displayed as the task name in the diagram created at the same time. An activity should always be used as the task name.

  • Description

    Describes the activity in more detail.

  • Responsibility (lane)

    A lane represents responsibilities within a process, such as the roles or systems involved.

    An entry leads to a lane being created in the diagram. Lanes with the same name are combined into one lane.

Every process in the Happy Path editor has a start event and an end event. The start event is always in the first row of the table. The end event is always in the last row of the table.

In the ⋮ menu, you can position a new task using the commands Insert task above and Insert task below, and delete it using Delete task. Start and end events cannot be moved or deleted.

You can insert the contents of tables from Microsoft Word or Excel via the clipboard, preferably three-column tables with the same structure.

Preview of the process diagram

At the same time as the entries in the table, the corresponding process diagram for the Happy Path is created automatically.

Your process draft only becomes visible to others once you submit it. You can therefore edit and save it as you like beforehand.

How to proceed

  1. If you have named and described a process draft and saved it as a process sketch, click the draft under Drafts.

    The input screen for a process draft appears with the Happy Path section.

  2. If the input screen for a new draft is still open, click Capture the ‘Happy Path’ first.

    The Happy Path section appears.

  3. To create a task, click the plus icon or use the ⋮ menu.

    A task row is added and the default name appears.

  4. To name a task, enter its name in the input field under Task.

    The name appears in the diagram.

  5. To describe a task, enter its description in the input field under Description.

  6. To assign a task to a lane, enter the name of the responsibility in the input field under Responsibility (lane).

    The task is assigned to the lane in the diagram. Responsibilities that have already been assigned are suggested below the input field when you click in it.

  7. To reposition a task in the sequence, move it with the mouse or use [Alt]+[Shift]+[Up] or [Alt]+[Shift]+[Down].

    The task is moved. Start and end events cannot be moved.

  8. To save the Happy Path and the associated diagram, click Save draft.

    The process draft is saved under the name entered. A confirmation message appears.

  9. To add the process draft to the Process Space, click Submit.

    The Submit as process revision dialog appears.

    The draft is added to the Process Space under the name entered.

War diese Seite hilfreich?